In Bezdružice, we galvanize the overhauled railing of the Čech Bridge

During the whole last year, we had gradually galvanized the overhauled, richly decorated Art Nouveau railings of the Prague’s Čech Bridge in our Bezdružice galvanizing plant. 169 meters long bridge connecting the Curie Square on the right-hand bank s with the Edvard Beneš Embankment on the left-hand bank, is the only such large ornate bridge structure in the Czech Republic that is a protected technical monument. The individual parts of the overhauled railings are gradually galvanized in Bezdružice, while the first parts of the railings were galvanized in the original "old" galvanizing plant and now we are continuing the project in the new galvanizing plant.

cross